{"id":5908,"date":"2026-02-13T06:43:04","date_gmt":"2026-02-12T22:43:04","guid":{"rendered":"https:\/\/sridrone.com\/how-set-fat-sat-acceptance-criteria-sourcing\/"},"modified":"2026-02-13T06:43:04","modified_gmt":"2026-02-12T22:43:04","slug":"comment-definir-les-criteres-dacceptation-fat-sat-pour-lapprovisionnement","status":"publish","type":"post","link":"https:\/\/sridrone.com\/fr\/how-set-fat-sat-acceptance-criteria-sourcing\/","title":{"rendered":"Comment d\u00e9finir les crit\u00e8res d'acceptation FAT\/SAT lors de l'approvisionnement en drones de lutte contre l'incendie en provenance de Chine ?"},"content":{"rendered":"<style>article img, .entry-content img, .post-content img, .wp-block-image img, figure img, p img {max-width:100% !important; height:auto !important;}figure { max-width:100%; }img.top-image-square {width:280px; height:280px; object-fit:cover;border-radius:12px; box-shadow:0 2px 12px rgba(0,0,0,0.10);}@media (max-width:600px) {img.top-image-square { width:100%; height:auto; max-height:300px; }p:has(> img.top-image-square) { float:none !important; margin:0 auto 15px auto !important; text-align:center; }}.claim { background-color:#fff4f4; border-left:4px solid #e63946; border-radius:10px; padding:20px 24px; margin:24px 0; font-family:system-ui,sans-serif; line-height:1.6; position:relative; box-shadow:0 2px 6px rgba(0,0,0,0.03); }.claim-true { background-color:#eafaf0; border-left-color:#2ecc71; }.claim-icon { display:inline-block; font-size:18px; color:#e63946; margin-right:10px; vertical-align:middle; }.claim-true .claim-icon { color:#2ecc71; }.claim-title { display:flex; align-items:center; font-weight:600; font-size:16px; color:#222; }.claim-label { margin-left:auto; font-size:12px; background-color:#e63946; color:#fff; padding:3px 10px; border-radius:12px; font-weight:bold; }.claim-true .claim-label { background-color:#2ecc71; }.claim-explanation { margin-top:8px; color:#555; font-size:15px; }.claim-pair { margin:32px 0; }<\/style>\n<p style=\"float: right; margin-left: 15px; margin-bottom: 15px;\">\n  <img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936073917-1.jpg\" alt=\"Establishing FAT and SAT acceptance criteria for sourcing firefighting drones from Chinese manufacturers (ID#1)\" class=\"top-image-square\">\n<\/p>\n<p>When our production team ships <a href=\"https:\/\/microavia.com\/firefighting-drones-functions-advantages-use-cases\/\" target=\"_blank\" rel=\"noopener noreferrer\">firefighting drones<\/a> <sup id=\"ref-1\"><a href=\"#footnote-1\" class=\"footnote-ref\">1<\/a><\/sup> overseas, we often hear the same concern from procurement managers: &#8220;How do I know this drone actually performs as promised?&#8221; The frustration is real. You invest thousands of dollars, wait weeks for delivery, and then discover the <a href=\"https:\/\/www.dwyeromega.com\/what-is-a-thermal-imaging-camera\/\" target=\"_blank\" rel=\"noopener noreferrer\">thermal camera<\/a> <sup id=\"ref-2\"><a href=\"#footnote-2\" class=\"footnote-ref\">2<\/a><\/sup> underperforms or the flight time falls short.<\/p>\n<p><strong>To set effective FAT\/SAT acceptance criteria for firefighting drones from China, you must define specific performance benchmarks at the factory, verify operational standards upon delivery, validate all custom OEM features before final payment, and establish durability and flight endurance thresholds with measurable test protocols and third-party inspection support.<\/strong><\/p>\n<p>This guide walks you through each critical step <a href=\"https:\/\/operations1.com\/wiki\/factory-acceptance-test-fat\/\" target=\"_blank\" rel=\"noopener noreferrer\">Factory Acceptance Test<\/a> <sup id=\"ref-3\"><a href=\"#footnote-3\" class=\"footnote-ref\">3<\/a><\/sup>. We will cover exactly what tests to require, what documentation to demand, and how to protect your investment from start to finish.<\/p>\n<h2>What specific performance benchmarks should I include in my Factory Acceptance Test (FAT) for firefighting drones?<\/h2>\n<p>Our engineers have tested hundreds of firefighting drones before they leave our facility <a href=\"https:\/\/operations1.com\/wiki\/site-acceptance-test-sat\/\" target=\"_blank\" rel=\"noopener noreferrer\">Site Acceptance Test<\/a> <sup id=\"ref-4\"><a href=\"#footnote-4\" class=\"footnote-ref\">4<\/a><\/sup>. We understand what can go wrong\u2014and more importantly, what tests catch problems early. Many buyers skip detailed FAT specifications, only to face expensive surprises later.<\/p>\n<p><strong>Your FAT should include thermal imaging accuracy tests, AI fire detection validation under smoke conditions, payload deployment precision checks, flight controller calibration verification, communication range tests, and full documentation review including calibration records and software version confirmations.<\/strong><\/p>\n<p><img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936076462-2.jpg\" alt=\"Factory Acceptance Test benchmarks for thermal imaging and AI fire detection in firefighting drones (ID#2)\" title=\"FAT Performance Benchmarks\"><\/p>\n<h3>Core Performance Tests to Require<\/h3>\n<p>The FAT happens at the manufacturer&#39;s site before shipping. This is your best opportunity to catch defects. Here are the essential benchmarks:<\/p>\n<p><strong>Thermal Imaging Accuracy<\/strong>: Request tests that verify temperature measurement accuracy within \u00b12\u00b0C across the operational range. The camera should detect heat signatures through moderate smoke. Ask for recorded test footage with temperature overlays.<\/p>\n<p><strong>AI Fire Detection<\/strong>: If your drone uses AI for fire detection, require validation tests under multiple conditions. <a href=\"https:\/\/pano.ai\/wildfire-detection-technology\/\" target=\"_blank\" rel=\"noopener noreferrer\">AI Fire Detection<\/a> <sup id=\"ref-5\"><a href=\"#footnote-5\" class=\"footnote-ref\">5<\/a><\/sup> This includes bright sunlight (glare), smoke interference, and nighttime operation. The detection rate should exceed 95% in controlled scenarios.<\/p>\n<p><strong>Payload Deployment<\/strong>: For drones carrying fire extinguishing agents or rescue equipment, test the release mechanism. Verify accuracy within a 1-meter radius from a 30-meter altitude. Document the release timing and mechanism reliability.<\/p>\n<h3>Documentation Requirements<\/h3>\n<table>\n<thead>\n<tr>\n<th>Document Type<\/th>\n<th>What to Verify<\/th>\n<th>Why It Matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Calibration Records<\/td>\n<td>Sensor calibration dates and values<\/td>\n<td>Ensures accurate readings<\/td>\n<\/tr>\n<tr>\n<td>Software Version Log<\/td>\n<td>Firmware and flight controller versions<\/td>\n<td>Confirms latest stable releases<\/td>\n<\/tr>\n<tr>\n<td>Component Certificates<\/td>\n<td>Battery, motor, ESC certifications<\/td>\n<td>Validates safety compliance<\/td>\n<\/tr>\n<tr>\n<td>Test Flight Data<\/td>\n<td>Telemetry logs from test flights<\/td>\n<td>Proves actual performance<\/td>\n<\/tr>\n<tr>\n<td>Quality Inspection Reports<\/td>\n<td>QC checkpoint records<\/td>\n<td>Shows manufacturing consistency<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Chinese National Standards Compliance<\/h3>\n<p>Require adherence to <a href=\"https:\/\/en.people.cn\/n3\/2025\/1210\/c90000-10182372.html\" target=\"_blank\" rel=\"noopener noreferrer\">Chinese civil drone standards<\/a> <sup id=\"ref-6\"><a href=\"#footnote-6\" class=\"footnote-ref\">6<\/a><\/sup>. These cover technical requirements, safety protocols, and operational specifications. Key standards include GB\/T 38058-2019 for civilian UAV product general requirements. Compliance documentation should be part of your FAT package.<\/p>\n<h3>Third-Party Inspection<\/h3>\n<p>We always recommend clients hire independent inspection agencies in China. Companies like SGS, Bureau Veritas, or local specialized drone inspection firms can witness FAT procedures. This adds a layer of verification that protects both parties.<\/p>\n<p>The inspection should cover:<\/p>\n<ul>\n<li>Visual inspection of all components<\/li>\n<li>Functional testing of critical systems<\/li>\n<li>Documentation review and verification<\/li>\n<li>Packaging quality assessment<\/li>\n<\/ul>\n<div class=\"claim-pair\">\n<div class=\"claim claim-true\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2714<\/span> FAT testing should include documented thermal imaging accuracy verification under smoke conditions. <span class=\"claim-label\">True<\/span><\/div>\n<div class=\"claim-explanation\">Firefighting drones operate in smoky environments. Testing thermal camera performance through smoke at the factory ensures the equipment will function reliably during actual fire emergencies.<\/div>\n<\/div>\n<div class=\"claim claim-false\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2718<\/span> A simple power-on test at the factory is sufficient for FAT approval. <span class=\"claim-label\">False<\/span><\/div>\n<div class=\"claim-explanation\">Power-on tests only confirm basic electrical function. They cannot verify sensor accuracy, flight performance, payload systems, or software functionality\u2014all critical for firefighting operations.<\/div>\n<\/div>\n<\/div>\n<h2>How can I verify that my drones meet operational standards during the Site Acceptance Test (SAT) after they arrive from China?<\/h2>\n<p>When we ship drones to clients in the US and Europe, we provide detailed SAT checklists because we know the delivery journey is harsh. Vibration, temperature changes, and handling can affect sensitive equipment. The SAT confirms everything still works after transit.<\/p>\n<p><strong>Your SAT should verify physical condition through documented unboxing, confirm all systems function correctly in your operational environment, test integration with your existing command systems, validate communication range and reliability, and compare actual performance against FAT benchmark results.<\/strong><\/p>\n<p><img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936078994-3.jpg\" alt=\"Verifying drone operational standards and system functionality during the Site Acceptance Test process (ID#3)\" title=\"Site Acceptance Testing Verification\"><\/p>\n<h3>Unboxing and Physical Inspection<\/h3>\n<p>Start with documented evidence. This protects you if you need to file claims for shipping damage or manufacturing defects.<\/p>\n<p><strong>Required Evidence Collection<\/strong>:<\/p>\n<ul>\n<li>High-resolution photos of packaging condition before opening<\/li>\n<li>Unboxing video showing all contents and their condition<\/li>\n<li>Close-up images of any visible damage or concerns<\/li>\n<li>Photos of serial numbers matching documentation<\/li>\n<\/ul>\n<h3>Functional System Checks<\/h3>\n<p>After physical inspection, test each system independently before attempting flight.<\/p>\n<table>\n<thead>\n<tr>\n<th>System<\/th>\n<th>Test Procedure<\/th>\n<th>Pass Criteria<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Flight Controller<\/td>\n<td>Power on, check sensor initialization<\/td>\n<td>All sensors report normal<\/td>\n<\/tr>\n<tr>\n<td>Thermal Camera<\/td>\n<td>Display live feed, verify temperature readings<\/td>\n<td>Clear image, accurate temps<\/td>\n<\/tr>\n<tr>\n<td>GPS Module<\/td>\n<td>Acquire satellite lock<\/td>\n<td>Minimum 12 satellites, HDOP &lt; 1.5<\/td>\n<\/tr>\n<tr>\n<td>Communication<\/td>\n<td>Range test with ground station<\/td>\n<td>Specified range with &lt;1% packet loss<\/td>\n<\/tr>\n<tr>\n<td>Payload System<\/td>\n<td>Cycle release mechanism<\/td>\n<td>Smooth operation, correct timing<\/td>\n<\/tr>\n<tr>\n<td>Battery<\/td>\n<td>Full charge cycle, capacity test<\/td>\n<td>Within 95% of rated capacity<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Integration Testing<\/h3>\n<p>Your firefighting drones must work with existing emergency response systems. Test these integrations during SAT:<\/p>\n<p><strong>Command and Control Integration<\/strong>: Connect the drone to your dispatch systems. Verify data flows correctly. Test manual override functions.<\/p>\n<p><strong>Communication Network Compatibility<\/strong>: Confirm the drone communicates reliably on your frequencies. Test through walls, around obstacles, and at maximum planned distances.<\/p>\n<p><strong>Data Sharing<\/strong>: Verify thermal imagery and telemetry data streams to your platforms. Check video latency and quality.<\/p>\n<h3>Cybersecurity Validation<\/h3>\n<p>This step is often overlooked but critical. Test the drone&#39;s resistance to unauthorized access. Verify encryption on data links. Confirm firmware cannot be modified without proper authorization.<\/p>\n<p>Basic cybersecurity tests include:<\/p>\n<ul>\n<li>Attempting connection with unauthorized controllers<\/li>\n<li>Testing data link encryption strength<\/li>\n<li>Verifying GPS spoofing resistance<\/li>\n<li>Checking for unauthorized network connections<\/li>\n<\/ul>\n<h3>Comparative Performance Analysis<\/h3>\n<p>Compare SAT results directly to FAT documentation. Any significant performance degradation indicates potential shipping damage or component failure. Document all variances and address them before final acceptance.<\/p>\n<div class=\"claim-pair\">\n<div class=\"claim claim-true\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2714<\/span> Documented unboxing videos provide essential evidence for shipping damage claims. <span class=\"claim-label\">True<\/span><\/div>\n<div class=\"claim-explanation\">Video evidence showing the condition of packaging and contents upon arrival creates an undeniable record. This documentation is often required by shipping insurers and helps resolve disputes with manufacturers or carriers.<\/div>\n<\/div>\n<div class=\"claim claim-false\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2718<\/span> If a drone passed FAT, it will automatically pass SAT without issues. <span class=\"claim-label\">False<\/span><\/div>\n<div class=\"claim-explanation\">Shipping involves vibration, temperature extremes, and handling stress. Components can loosen, calibrations can drift, and damage can occur. SAT specifically catches these post-shipping problems.<\/div>\n<\/div>\n<\/div>\n<h2>What steps should I take to ensure my custom OEM features are fully validated before final payment?<\/h2>\n<p>Our OEM clients often request specialized features\u2014custom payload mounts, proprietary software interfaces, or unique branding elements. We have learned that clear validation protocols prevent misunderstandings and protect both parties. Without proper validation steps, disputes over &quot;custom&quot; versus &quot;standard&quot; features can delay projects for months.<\/p>\n<p><strong>Before final payment, require written feature specifications with measurable acceptance criteria, conduct witnessed testing of each custom element, obtain source code or configuration access for software customizations, verify branding and labeling accuracy, and document everything with signed acceptance certificates for each OEM component.<\/strong><\/p>\n<p><img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936081571-5.jpg\" alt=\"Defining drone durability criteria including flight endurance and IP ratings for weather resistance (ID#5)\" title=\"Drone Durability and Endurance\"><\/p>\n<h3>Define Custom Features Clearly<\/h3>\n<p>Ambiguity kills OEM projects. Every custom feature needs precise specifications.<\/p>\n<p><strong>Create a Custom Feature Specification Document<\/strong> that includes:<\/p>\n<ul>\n<li>Technical parameters with measurable values<\/li>\n<li>Visual references (drawings, renders, photos)<\/li>\n<li>Material specifications where applicable<\/li>\n<li>Performance requirements under defined conditions<\/li>\n<li>Integration requirements with other systems<\/li>\n<\/ul>\n<h3>Staged Validation Protocol<\/h3>\n<p>Do not wait until final delivery to validate custom features. Break validation into stages tied to payment milestones.<\/p>\n<table>\n<thead>\n<tr>\n<th>Stage<\/th>\n<th>Validation Focus<\/th>\n<th>Payment Release<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Design Approval<\/td>\n<td>Review drawings and specifications<\/td>\n<td>10-20%<\/td>\n<\/tr>\n<tr>\n<td>Prototype Validation<\/td>\n<td>Test functional prototype<\/td>\n<td>20-30%<\/td>\n<\/tr>\n<tr>\n<td>Pilot Batch Test<\/td>\n<td>Validate production samples<\/td>\n<td>20-30%<\/td>\n<\/tr>\n<tr>\n<td>Final FAT<\/td>\n<td>Complete system validation<\/td>\n<td>Remaining balance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Software Customization Validation<\/h3>\n<p>For custom software features, require specific deliverables:<\/p>\n<p><strong>Source Code Access<\/strong>: If you paid for custom development, you should receive source code or at minimum, configuration files that allow future modifications.<\/p>\n<p><strong>API Documentation<\/strong>: Custom integrations need complete documentation. Verify the documentation matches actual functionality.<\/p>\n<p><strong>Test Cases<\/strong>: Request the test cases used during development. Run these yourself to confirm the software performs as designed.<\/p>\n<h3>Hardware Customization Verification<\/h3>\n<p>Physical customizations require hands-on validation:<\/p>\n<ul>\n<li><strong>Dimensional Accuracy<\/strong>: Measure custom components against specifications<\/li>\n<li><strong>Material Verification<\/strong>: Confirm materials match what was specified<\/li>\n<li><strong>Fit Testing<\/strong>: Verify custom parts integrate correctly with standard components<\/li>\n<li><strong>Stress Testing<\/strong>: Apply appropriate loads to custom mounting points<\/li>\n<\/ul>\n<h3>Intellectual Property Protection<\/h3>\n<p>When investing in custom development, protect your intellectual property: <a href=\"https:\/\/www.wipo.int\/about-ip\/en\/\" target=\"_blank\" rel=\"noopener noreferrer\">Intellectual Property Protection<\/a> <sup id=\"ref-7\"><a href=\"#footnote-7\" class=\"footnote-ref\">7<\/a><\/sup><\/p>\n<ul>\n<li>Include IP ownership clauses in your contract<\/li>\n<li>Require non-disclosure agreements covering your custom specifications<\/li>\n<li>Obtain certificates confirming your exclusive rights to custom designs<\/li>\n<li>Verify the manufacturer will not offer your custom features to competitors<\/li>\n<\/ul>\n<h3>Branding and Labeling Accuracy<\/h3>\n<p>Check all branding elements carefully:<\/p>\n<ul>\n<li>Logo placement matches approved artwork<\/li>\n<li>Colors match specified values (provide Pantone references)<\/li>\n<li>Text is spelled correctly in all languages<\/li>\n<li>Regulatory labels include required information<\/li>\n<li>Serial number formats follow your specifications<\/li>\n<\/ul>\n<div class=\"claim-pair\">\n<div class=\"claim claim-true\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2714<\/span> Staged payment tied to validation milestones protects buyers during OEM projects. <span class=\"claim-label\">True<\/span><\/div>\n<div class=\"claim-explanation\">Releasing payments in stages ensures the manufacturer meets each specification before receiving full payment. This creates accountability checkpoints and reduces financial risk if the project fails to meet requirements.<\/div>\n<\/div>\n<div class=\"claim claim-false\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2718<\/span> Verbal agreements about custom features are sufficient for OEM orders. <span class=\"claim-label\">False<\/span><\/div>\n<div class=\"claim-explanation\">Verbal agreements cannot be enforced and lead to disputes about what was actually promised. Written specifications with measurable criteria are essential for OEM validation and legal protection.<\/div>\n<\/div>\n<\/div>\n<h2>How do I define durability and flight endurance criteria to avoid receiving substandard drone equipment?<\/h2>\n<p>In our production facility, we test every drone model extensively before releasing it to market. However, we know some buyers have received equipment from other suppliers that failed within weeks. Defining clear durability criteria in your acceptance tests prevents this disappointment.<\/p>\n<p><strong>Define durability criteria by specifying minimum flight cycle counts, environmental operating ranges with tested thresholds, component rated lifespans, warranty coverage terms, IP ratings for weather resistance, and flight endurance tests under realistic payload and environmental conditions\u2014all documented with verifiable test data.<\/strong><\/p>\n<p><img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/placehold.co\/600x400.jpg\" alt=\"drone durability testing environmental chamber\"><\/p>\n<h3>Flight Endurance Testing Standards<\/h3>\n<p>Flight time claims are often exaggerated. Require testing under realistic conditions.<\/p>\n<p><strong>Test Conditions to Specify<\/strong>:<\/p>\n<ul>\n<li>Payload weight during test (full firefighting payload)<\/li>\n<li>Ambient temperature range<\/li>\n<li>Wind speed during test<\/li>\n<li>Flight pattern (hover vs. forward flight)<\/li>\n<li>Battery state (new vs. after specified cycles)<\/li>\n<\/ul>\n<h3>Environmental Durability Requirements<\/h3>\n<p>Firefighting drones face extreme conditions. Define environmental requirements clearly:<\/p>\n<table>\n<thead>\n<tr>\n<th>Parameter<\/th>\n<th>Minimum Requirement<\/th>\n<th>Test Method<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Operating Temperature<\/td>\n<td>-10\u00b0C to +50\u00b0C<\/td>\n<td>Chamber testing<\/td>\n<\/tr>\n<tr>\n<td>Storage Temperature<\/td>\n<td>-20\u00b0C to +60\u00b0C<\/td>\n<td>Extended exposure<\/td>\n<\/tr>\n<tr>\n<td>Wind Resistance<\/td>\n<td>12 m\/s sustained<\/td>\n<td>Wind tunnel or field<\/td>\n<\/tr>\n<tr>\n<td>Water Resistance<\/td>\n<td>IP54 minimum<\/td>\n<td>Spray testing<\/td>\n<\/tr>\n<tr>\n<td>Dust Resistance<\/td>\n<td>IP54 minimum<\/td>\n<td>Chamber exposure<\/td>\n<\/tr>\n<tr>\n<td>Vibration Tolerance<\/td>\n<td>Per MIL-STD-810<\/td>\n<td>Shaker table<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Component Lifespan Specifications<\/h3>\n<p>Request documented lifespan expectations for critical components:<\/p>\n<p><strong>Motors<\/strong>: Minimum rated hours (typically 200-500 hours for industrial drones)<br \/><strong>ESCs<\/strong>: Expected cycle life and MTBF (Mean Time Between Failures)<br \/><strong>Batteries<\/strong>: Cycle count rating (typically 300-500 cycles to 80% capacity)<br \/><strong>Propellers<\/strong>: Recommended replacement intervals<br \/><strong>Bearings<\/strong>: Service intervals and replacement indicators<\/p>\n<h3>Long-Term Maintainability Criteria<\/h3>\n<p>Durability includes the ability to maintain and repair equipment over time.<\/p>\n<p><strong>Spare Parts Availability<\/strong>: Require guaranteed availability of spare parts for a minimum period (typically 5-7 years). Get this commitment in writing with pricing frameworks.<\/p>\n<p><strong>Field Serviceability<\/strong>: Verify that common maintenance tasks can be performed without specialized equipment. Request maintenance manuals and training materials.<\/p>\n<p><strong>Technical Support Access<\/strong>: Define response time expectations for technical support. Specify whether support includes video calls, on-site visits, or remote diagnostics.<\/p>\n<h3>Warranty Terms Validation<\/h3>\n<p>Review warranty terms carefully before accepting delivery:<\/p>\n<ul>\n<li>Coverage period for different components<\/li>\n<li>What voids the warranty<\/li>\n<li>Process for warranty claims<\/li>\n<li>Turnaround time for repairs or replacements<\/li>\n<li>Who pays shipping for warranty service<\/li>\n<\/ul>\n<h3>Documentation for Long-Term Support<\/h3>\n<p>Request comprehensive maintenance documentation including:<\/p>\n<ul>\n<li>Detailed maintenance schedules<\/li>\n<li>Troubleshooting guides<\/li>\n<li>Wiring diagrams and schematics<\/li>\n<li>Calibration procedures<\/li>\n<li>Software update procedures<\/li>\n<\/ul>\n<div class=\"claim-pair\">\n<div class=\"claim claim-true\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2714<\/span> Flight endurance tests must specify payload weight and environmental conditions to be meaningful. <span class=\"claim-label\">True<\/span><\/div>\n<div class=\"claim-explanation\">A drone&#8217;s flight time varies dramatically based on payload and conditions. Testing without a full firefighting payload in ideal conditions produces inflated numbers that do not reflect real-world performance.<\/div>\n<\/div>\n<div class=\"claim claim-false\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2718<\/span> <a href=\"https:\/\/uk.rs-online.com\/web\/content\/discover\/ideas-and-advice\/ip-ratings-explained\" target=\"_blank\" rel=\"noopener noreferrer\">IP ratings<\/a> <sup id=\"ref-8\"><a href=\"#footnote-8\" class=\"footnote-ref\">8<\/a><\/sup> guarantee a drone will survive firefighting conditions indefinitely. <span class=\"claim-label\">False<\/span><\/div>\n<div class=\"claim-explanation\">IP ratings indicate resistance levels under specific test conditions, not permanent immunity. Repeated exposure to water, heat, and debris still causes wear. IP ratings should be considered minimum standards, not guarantees of unlimited durability.<\/div>\n<\/div>\n<\/div>\n<h2>Conclusion<\/h2>\n<p>Setting proper FAT\/SAT criteria protects your investment when sourcing firefighting drones from China. Define specific benchmarks, require third-party verification, validate custom features before payment, and establish clear durability standards. With proper acceptance criteria, you receive equipment that performs as promised.<\/p>\n<h2>Footnotes<\/h2>\n<p><span id=\"footnote-1\"><br \/>\n1. Provides an overview of drone applications in firefighting. <a href=\"#ref-1\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-2\"><br \/>\n2. Explains the technology and function of thermal imaging cameras. <a href=\"#ref-2\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-3\"><br \/>\n3. Defines Factory Acceptance Test (FAT) and its purpose. <a href=\"#ref-3\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-4\"><br \/>\n4. Defines Site Acceptance Test (SAT) and its importance. <a href=\"#ref-4\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-5\"><br \/>\n5. Illustrates the application of AI in wildfire detection technology. <a href=\"#ref-5\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-6\"><br \/>\n6. Details mandatory national standards for civil drones in China. <a href=\"#ref-6\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-7\"><br \/>\n7. Provides an authoritative definition and overview of intellectual property and its protection. <a href=\"#ref-7\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-8\"><br \/>\n8. Provides a comprehensive explanation of Ingress Protection (IP) ratings. <a href=\"#ref-8\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"mainEntity\": [\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How to Set FAT\/SAT Acceptance Criteria When Sourcing Firefighting Drones From China?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"To set effective FAT\/SAT acceptance criteria for firefighting drones from China, you must define specific performance benchmarks at the factory, verify operational standards upon delivery, validate all custom OEM features before final payment, and establish durability and flight endurance thresholds with measurable test protocols and third-party inspection support.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What specific performance benchmarks should I include in my Factory Acceptance Test (FAT) for firefighting drones?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Your FAT should include thermal imaging accuracy tests, AI fire detection validation under smoke conditions, payload deployment precision checks, flight controller calibration verification, communication range tests, and full documentation review including calibration records and software version confirmations.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How can I verify that my drones meet operational standards during the Site Acceptance Test (SAT) after they arrive from China?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Your SAT should verify physical condition through documented unboxing, confirm all systems function correctly in your operational environment, test integration with your existing command systems, validate communication range and reliability, and compare actual performance against FAT benchmark results.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What steps should I take to ensure my custom OEM features are fully validated before final payment?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Before final payment, require written feature specifications with measurable acceptance criteria, conduct witnessed testing of each custom element, obtain source code or configuration access for software customizations, verify branding and labeling accuracy, and document everything with signed acceptance certificates for each OEM component.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How do I define durability and flight endurance criteria to avoid receiving substandard drone equipment?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Define durability criteria by specifying minimum flight cycle counts, environmental operating ranges with tested thresholds, component rated lifespans, warranty coverage terms, IP ratings for weather resistance, and flight endurance tests under realistic payload and environmental conditions\u2014all documented with verifiable test data.\"\n      }\n    }\n  ]\n}\n<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n[\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"FAT testing should include documented thermal imaging accuracy verification under smoke conditions.\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 5,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"True\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"A simple power-on test at the factory is sufficient for FAT approval.\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 1,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"False\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"Documented unboxing videos provide essential evidence for shipping damage claims.\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 5,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"True\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"If a drone passed FAT, it will automatically pass SAT without issues.\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 1,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"False\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"Staged payment tied to validation milestones protects buyers during OEM projects.\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 5,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"True\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"Verbal agreements about custom features are sufficient for OEM orders.\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 1,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"False\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"Flight endurance tests must specify payload weight and environmental conditions to be meaningful.\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 5,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"True\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"<a href=\\\"https:\/\/uk.rs-online.com\/web\/content\/discover\/ideas-and-advice\/ip-ratings-explained\\\" target=\\\"_blank\\\" rel=\\\"noopener noreferrer\\\">IP ratings<\/a> <sup id=\\\"ref-8\\\"><a href=\\\"#footnote-8\\\" class=\\\"footnote-ref\\\">8<\/a><\/sup> guarantee a drone will survive firefighting conditions indefinitely.\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 1,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"False\"\n    }\n  }\n]\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pour d\u00e9finir des crit\u00e8res d'acceptation FAT\/SAT efficaces pour les drones de lutte contre l'incendie provenant de Chine, vous devez d\u00e9finir des points de r\u00e9f\u00e9rence de performance sp\u00e9cifiques en usine, v\u00e9rifier le fonctionnement\u2026<\/p>","protected":false},"author":1,"featured_media":5898,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_angie_page":false,"page_builder":"","footnotes":""},"categories":[110],"tags":[],"class_list":["post-5908","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-firefighting-drone"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>How to Set FAT\/SAT Acceptance Criteria When Sourcing Firefighting Drones From China? - SkyRover Industrial Drones<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/sridrone.com\/fr\/comment-definir-les-criteres-dacceptation-fat-sat-pour-lapprovisionnement\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Set FAT\/SAT Acceptance Criteria When Sourcing Firefighting Drones From China?\" \/>\n<meta property=\"og:description\" content=\"To set effective FAT\/SAT acceptance criteria for firefighting drones from China, you must define specific performance benchmarks at the factory, verify opera...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/sridrone.com\/fr\/comment-definir-les-criteres-dacceptation-fat-sat-pour-lapprovisionnement\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyRover Industrial Drones\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-12T22:43:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936073917-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Kong\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kong\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How to Set FAT\/SAT Acceptance Criteria When Sourcing Firefighting Drones From China? - SkyRover Industrial Drones","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/sridrone.com\/fr\/comment-definir-les-criteres-dacceptation-fat-sat-pour-lapprovisionnement\/","og_locale":"fr_FR","og_type":"article","og_title":"How to Set FAT\/SAT Acceptance Criteria When Sourcing Firefighting Drones From China?","og_description":"To set effective FAT\/SAT acceptance criteria for firefighting drones from China, you must define specific performance benchmarks at the factory, verify opera...","og_url":"https:\/\/sridrone.com\/fr\/comment-definir-les-criteres-dacceptation-fat-sat-pour-lapprovisionnement\/","og_site_name":"SkyRover Industrial Drones","article_published_time":"2026-02-12T22:43:04+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936073917-1.webp","type":"image\/webp"}],"author":"Kong","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Kong","Dur\u00e9e de lecture estim\u00e9e":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/#article","isPartOf":{"@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/"},"author":{"name":"Kong","@id":"https:\/\/sridrone.com\/es\/#\/schema\/person\/09cbc9de754e121146b86abc4a9ee807"},"headline":"How to Set FAT\/SAT Acceptance Criteria When Sourcing Firefighting Drones From China?","datePublished":"2026-02-12T22:43:04+00:00","mainEntityOfPage":{"@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/"},"wordCount":2156,"commentCount":0,"publisher":{"@id":"https:\/\/sridrone.com\/es\/#organization"},"image":{"@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/#primaryimage"},"thumbnailUrl":"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936073917-1.webp","articleSection":["Firefighting Drone"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/","url":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/","name":"How to Set FAT\/SAT Acceptance Criteria When Sourcing Firefighting Drones From China? - SkyRover Industrial Drones","isPartOf":{"@id":"https:\/\/sridrone.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/#primaryimage"},"image":{"@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/#primaryimage"},"thumbnailUrl":"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936073917-1.webp","datePublished":"2026-02-12T22:43:04+00:00","breadcrumb":{"@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/#primaryimage","url":"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936073917-1.webp","contentUrl":"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/02\/v2-article-1770936073917-1.webp","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/sridrone.com\/es\/como-establecer-criterios-de-aceptacion-fat-sat-abastecimiento\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/sridrone.com\/es\/"},{"@type":"ListItem","position":2,"name":"How to Set FAT\/SAT Acceptance Criteria When Sourcing Firefighting Drones From China?"}]},{"@type":"WebSite","@id":"https:\/\/sridrone.com\/es\/#website","url":"https:\/\/sridrone.com\/es\/","name":"SkyRover Industrial Drone","description":"Un fabricant professionnel de drones de lutte contre les incendies, de drones agricoles et de drones de livraison de marchandises.","publisher":{"@id":"https:\/\/sridrone.com\/es\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/sridrone.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/sridrone.com\/es\/#organization","name":"SkyRover Industrial Drone","url":"https:\/\/sridrone.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/sridrone.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/01\/400x400skyroverlogo.png","contentUrl":"https:\/\/sridrone.com\/wp-content\/uploads\/2026\/01\/400x400skyroverlogo.png","width":400,"height":400,"caption":"SkyRover Industrial Drone"},"image":{"@id":"https:\/\/sridrone.com\/es\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/sridrone.com\/es\/#\/schema\/person\/09cbc9de754e121146b86abc4a9ee807","name":"Kong","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/c9ef0ccfb314c8803023560c97cab787692ab7de1e607e67d9eb308b91561b84?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c9ef0ccfb314c8803023560c97cab787692ab7de1e607e67d9eb308b91561b84?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c9ef0ccfb314c8803023560c97cab787692ab7de1e607e67d9eb308b91561b84?s=96&d=mm&r=g","caption":"Kong"},"sameAs":["https:\/\/sandybrown-loris-568228.hostingersite.com"],"url":"https:\/\/sridrone.com\/fr\/author\/alan-kongxgmail-com\/"}]}},"_links":{"self":[{"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/posts\/5908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/comments?post=5908"}],"version-history":[{"count":0,"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/posts\/5908\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/media\/5898"}],"wp:attachment":[{"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/media?parent=5908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/categories?post=5908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sridrone.com\/fr\/wp-json\/wp\/v2\/tags?post=5908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}